Tuesday 8 July 2014

Preparing to paint

We are three quarters away from sanding back one side of the boat, all in all the outside planks are in good shape, we need to completly caulk this side of the boat, the old oakum falls out in some places.





We have built a couple of rafts from two old barrells ans two scaffold tower boards with the planks from downstairs.

With our weather being as it is we have tarpaulined the whole side of the boat.








The first plank is rotted in one place, luckily enough it is small enough to fill with the epoxy filler.







No comments:

Post a Comment