Central Heating, Diesel Boiler Cast iron Rads

The boiler is in place in the engine room,  all the pipework for the rads is in place, we have to finish the parquet Middle section in the front room allowing us to finally connect the two rads to the system.

Floors laid ready for the radiators and to be sanded back and the boiler in it's final resting place.