Friday, 20 February 2015

Update

We have survived a winter with very minor issues no dramas a couple of leaks condensation from the port holes in the front room which are going to be cleaned up and perspex will be cut to size and stuck over the port hole and surround, a method used by others that stops it all together, we will do a seperate post.

We have been busy inside, the partition wall for the wet room is up, a new bilge hatch has been cut, we have started to double ply the hall way and we have sussed out exactly wher the stair has to be to maximise the space available.

In the bedrooms the Mahogany strip floor has been sanded and filled in parts. Now the partition wall is up we can start to fit out the rooms get the side panels on and clad the wall,






No comments:

Post a Comment